Looking for some inspiration? Check out our collection of Healthcare construction projects and learn more about the benefits of using Senergy Wall Systems in your next building project.
Penn State Health Children’s Lancaster Pediatric Center
The recently completed Penn State Health Children’s Lancaster Pediatric Center uses Senergy's Insulated Masonry Veneer System to achieve a multi-cladding aesthetic, while reducing construction complexity and costs.
Specifically designed to be a state-of-the-art healthcare facility, this one-story VA Outpatient Clinic located in Lansing, Michigan is covered in 12k sq. ft. of Senergy Channeled Adhesive CI Design System with Senerflex Fine Finish.
Shannon Rehabilitation Hospital in San Angelo, Texas
Shannon Rehabilitation Hospital seamlessly integrates stone veneer over continuous insulation and weather barrier using the Channeled Adhesive CI Design with MaxGrip Veneer Mortar.
Ascension Sacred Heart Rehabilitation Center in Pensacola, Florida
The exterior of the facility incorporates the Channeled Adhesive CI Design with MaxGrip Veneer, a fully integrated wall system that allows the installation of masonry veneer over continuous insulation (CI).
South Valley Prefab used Senergy's Insulated Masonry Veneer System to manufacture and install prefabricated panels on a hospital expansion project in Denver, CO.
Wilson Medical Center, serving the Wilson, North Carolina community is modernized and restored into a best-in-class healthcare facility with Senergy's Channeled Adhesive CI Design.
Ecompass Health Rehabilitation Hospital in Waco, Texas
Encompass Health Rehabilitation Hospital of Waco, Texas was recently built using Senergy’s Insulated Masonry Veneer System. The advanced wall system incorporates continuous heat, air and moisture control layers and features MaxGrip Veneer Mortar.